电子游戏十大赌场

参观

Pinnacle were responsible for 运输ing four 202 tonne engines via a chartered vessel from Rotterdam and St. Nazaire to 参观 in Burkina Faso, using specially imported 运输 equipment. The aim of this project was to deliver an additional 72MW of power to an existing power plant, 改变了布基纳法索人民的生活.

这个项目进行了六个月的计划和工程, 我们总共讲了1个,100km. 从道路和桥梁调查, 支撑桥梁和修建道路, 以及运输途中因大雨而进行的道路维修, 这个项目是一个巨大的挑战. 尽管有极大的困难, we installed all heavy machinery to the final position within millimetre accuracy, 安全送达, 准时, 并在预算之内.

nasa-components

美国国家航空航天局 & 詹姆斯·韦伯望远镜

Pinnacle were responsible for delivering vital and quite literally priceless components of the James Webb Space Telescope, working closely with 美国国家航空航天局 in association with the University of Leicester’s Space Research Center (SRC) and the European Space Agency (ESA). This huge project was almost 15 years in development and involved end-to-end supervision of a very sensitive object with skilled handling in the UK and USA.

We were required to manage the temperature-controlled air cargo container, 优先登机区访问, 辊道系统, 航空货物安全豁免, 以及建造定制的航空货运奴隶托盘.

“Delivery to 美国国家航空航天局 of the MIRI instrument for the James Webb Space Telescope was the highest value shipment that we have ever been responsible for in 50 years of space research and the most difficult from a logistical point of view. Pinnacle在整个规划过程中发挥了重要作用, 组织, 并最终成功地实施交付计划. We look forward to working with them again on any similar future projects.”

Jonathan Sykes, Senior Engineer, Leicester University Space Research Centre UK

西方africa1

WestAfrica1

Pinnacle承揽了船运业务, 运输, 并在最后位置安装四台335te发动机, 4个78 te发电机, 还有两台76te变压器. We also had to 运输 all the associated ancillary equipment from North Europe through to a new build power station in West Africa.

The project was carried out in two separate shipments per chartered geared vessels. 这是一个具有挑战性的项目, in that all the heavy-lift installation and 运输 equipment had to be shipped in as there was no equipment of its type at the destination.

west-africa-2

WestAfrica2

Pinnacle公司也承包了船舶, 运输, 并安装三台335te发动机, 三个76年te发电机, and one 74te transformer in one shipment from North Europe to another site in West Africa.

这是另一个具有挑战性的项目. We had to ship in the heavy-lift 运输 and installation to handle the job – and not least was the three flights needed in order to reach the destination in person.

euro-shuttle

Euroshuttle

For over 15 years now, Pinnacle has held the contract to handle and move Euroshuttle locomotives. 最初, we were responsible for moving new locomotives to the maintenance shed at Coquelles in France. Then we began handling all the locomotives for the refurbishment program, 是谁升级了老式机车的动力.

在过去的15年多里, 我们参与了80多个运动, 所有转向架的拆卸/安装都需要专业人员的处理.

取得电子游戏十大赌场

打电话给我们 0

电子邮件 enquiry@pif.co.uk

货物跟踪

Using WebTracker you can track your consignments whenever you need to, 24hrs a day, 7 days a week. The system tracks your consignments at every stage of the journey, from pickup to delivery.

开始使用货运跟踪

用户名
密码